The frame for the reception glass front is awaiting installation
Viewed: 1105 times.
|
The hallway past the administrative offices taking final shape
Viewed: 1035 times.
|
Conduit placed in the walls will allow for cable passthroughs. if needed
Viewed: 1050 times.
|
The conduit is actually two separate pieces, indivdually supported
Viewed: 1008 times.
|
All laboratory door frames are supported with rubber isolation brackets
Viewed: 989 times.
|
Close up of a rubber isolation bracket
Viewed: 1033 times.
|
Cables that penetrate sound isolation walls are strung through conduit
Viewed: 1010 times.
|
Many walls are constructed of multiple layers of sheetrock
Viewed: 996 times.
|
The workers dine in style
Viewed: 1003 times.
|
More of the suspended ceiling grid
Viewed: 998 times.
|
The door frame between the physiology labs: East
Viewed: 1053 times.
|
The door frame between the physiology labs: West
Viewed: 1042 times.
|
A really wide view of the west open office area
Viewed: 1041 times.
|
The control rooms sound floor are coming along
Viewed: 1162 times.
|